Tableland Phase 1 Civil

We completed the underground civil infrastructure for the Tableland Phase 1 project, installing conduit systems and electrical duct banks to support the site’s power distribution network. The project included cable routing infrastructure and underground access components, completed with a focus on precision, quality, and long-term reliability.

Project Highlights

✔ Installed 2”, 4”, and 6” underground conduit runs

✔ Constructed multiple duct bank configurations

✔ Installed five pull boxes

✔ Installed two manholes

✔ Terminated conduits into the new cable trench