Tableland Phase 1 Civil
We completed the underground civil infrastructure for the Tableland Phase 1 project, installing conduit systems and electrical duct banks to support the site’s power distribution network. The project included cable routing infrastructure and underground access components, completed with a focus on precision, quality, and long-term reliability.
Project Highlights
✔ Installed 2”, 4”, and 6” underground conduit runs
✔ Constructed multiple duct bank configurations
✔ Installed five pull boxes
✔ Installed two manholes
✔ Terminated conduits into the new cable trench